5 story luxury wedding hall renovations and addition. OMC involvement in this project included the design of steel framing members for the 2-story addition, staircases, steel connections and the production of complete set of steel shop drawings including structural steel, staircases, railings, and misc. steel. Challenges include; the design of long span (55 ft) transfer beams with hangers to carry mezzanine floor to create a column-free space on main level, reinforcing and splicing details for existing steel, the design of outrigger steel to hold heavy decorative statues.
Status : Under construction
Scope : Structural design (partial), Steel detailing and connection design and steel inspections